GoTour: phased delivery (epic)
Issue #1 · closed
GoTour — phased delivery
This epic tracks the build of the GoTour interactive Go syntax & toolchain tutorial described in specs/requirements.md. All decisions baked into the breakdown are logged in docs/decisions.md.
How to use this epic
- Each phase below is a separately-implementable issue.
- Dependencies are inside each phase issue (and reflected in the order of the checklist).
- Content phases (11–18) can run in parallel after framework phases (1–10) close.
Phase checklist
- [ ] Phase 01 — Project scaffold & dev environment — #2
- [ ] Phase 02 — Go Playground proxy infrastructure — #3
- [ ] Phase 03 — Layout, routing, theming & landing page — #4
- [ ] Phase 04 — Lesson framework: types, registry, renderer — #5
- [ ] Phase 05 — Code runner: Monaco + execute + stream replay — #6
- [ ] Phase 06 — Pre-baked terminal pane (non-runnable lessons) — #7
- [ ] Phase 07 — Persistence layer (zustand + localStorage) — #8
- [ ] Phase 08 — Sidebar, section grouping, progress UI — #9
- [ ] Phase 09 — Search & command palette (Cmd/Ctrl+K) — #10
- [ ] Phase 10 — Checkpoint quiz framework — #11
- [ ] Phase 11 — Content: Sections A + B (fundamentals, control flow) — #12
- [ ] Phase 12 — Content: Sections C + D (composite types, functions) — #13
- [ ] Phase 13 — Content: Sections E + F + G (interfaces, generics, errors) — #14
- [ ] Phase 14 — Content: Section H (concurrency, solo) — #15
- [ ] Phase 15 — Content: Sections I + J (packages, reflection/low-level) — #16
- [ ] Phase 16 — Content: Section K group 1 (build/run/modules) — #17
- [ ] Phase 17 — Content: Section K group 2 (test/format/vet/doc) — #18
- [ ] Phase 18 — Content: Section K group 3 (advanced toolchain) — #19
- [ ] Phase 19 — Polish: Lighthouse, README, CONTRIBUTING — #20
Dependency graph (textual)
01 ──┬─► 02 ──► 05
└─► 03 ──► 04 ──┬─► 05 ──► 11..18
├─► 06 ──► 16, 17, 18
├─► 07 ──┬─► 08
│ └─► 10 ──► 11..18
├─► 08
├─► 09
└─► 10
11..18 ──► 19Acceptance: epic closes when
- All 19 phase issues are closed.
- Production preview meets Lighthouse Perf ≥ 90 / A11y ≥ 95.
- Every lesson runs (or renders its terminal pane) end-to-end.