Skip to content

GoTour: phased delivery (epic) ​

Issue #1 · closed

GoTour — phased delivery ​

This epic tracks the build of the GoTour interactive Go syntax & toolchain tutorial described in specs/requirements.md. All decisions baked into the breakdown are logged in docs/decisions.md.

How to use this epic ​

  • Each phase below is a separately-implementable issue.
  • Dependencies are inside each phase issue (and reflected in the order of the checklist).
  • Content phases (11–18) can run in parallel after framework phases (1–10) close.

Phase checklist ​

  • [ ] Phase 01 — Project scaffold & dev environment — #2
  • [ ] Phase 02 — Go Playground proxy infrastructure — #3
  • [ ] Phase 03 — Layout, routing, theming & landing page — #4
  • [ ] Phase 04 — Lesson framework: types, registry, renderer — #5
  • [ ] Phase 05 — Code runner: Monaco + execute + stream replay — #6
  • [ ] Phase 06 — Pre-baked terminal pane (non-runnable lessons) — #7
  • [ ] Phase 07 — Persistence layer (zustand + localStorage) — #8
  • [ ] Phase 08 — Sidebar, section grouping, progress UI — #9
  • [ ] Phase 09 — Search & command palette (Cmd/Ctrl+K) — #10
  • [ ] Phase 10 — Checkpoint quiz framework — #11
  • [ ] Phase 11 — Content: Sections A + B (fundamentals, control flow) — #12
  • [ ] Phase 12 — Content: Sections C + D (composite types, functions) — #13
  • [ ] Phase 13 — Content: Sections E + F + G (interfaces, generics, errors) — #14
  • [ ] Phase 14 — Content: Section H (concurrency, solo) — #15
  • [ ] Phase 15 — Content: Sections I + J (packages, reflection/low-level) — #16
  • [ ] Phase 16 — Content: Section K group 1 (build/run/modules) — #17
  • [ ] Phase 17 — Content: Section K group 2 (test/format/vet/doc) — #18
  • [ ] Phase 18 — Content: Section K group 3 (advanced toolchain) — #19
  • [ ] Phase 19 — Polish: Lighthouse, README, CONTRIBUTING — #20

Dependency graph (textual) ​

01 ──┬─► 02 ──► 05
     └─► 03 ──► 04 ──┬─► 05 ──► 11..18
                     ├─► 06 ──► 16, 17, 18
                     ├─► 07 ──┬─► 08
                     │         └─► 10 ──► 11..18
                     ├─► 08
                     ├─► 09
                     └─► 10
11..18 ──► 19

Acceptance: epic closes when ​

  • All 19 phase issues are closed.
  • Production preview meets Lighthouse Perf ≥ 90 / A11y ≥ 95.
  • Every lesson runs (or renders its terminal pane) end-to-end.

Built as an experiment in six-model parity.